Beating the backlog: meeting targets and providing free basic services
PUBLICATION YEAR: 2004
TITLE AUTHOR(S): D.Hemson
KEYWORDS: ELECTRIC POWER SUPPLY, INFRASTRUCTURE DELIVERY, KWAZULU-NATAL PROVINCE, LIMPOPO PROVINCE, LOCAL ECONOMIC DEVELOPMENT, SERVICE INDUSTRIES, WATER SERVICE DELIVERY
Intranet: HSRC Library: shelf number 2395
HANDLE: 20.500.11910/8216
URI: http://hdl.handle.net/20.500.11910/8216
If you would like to obtain a copy of this Research Output, please contact Hanlie Baudin at researchoutputs@hsrc.ac.za.
Abstract
This short paper concentrates on dealing with the backlogs in delivery with particular reference to the key life sustaining services of water and sanitation and life enhancing service of electricity. The first point is that considerable additional resources are needed to make these services available to the rural poor. The easy part of delivery has been the investment in infrastructure to the more accessible communities on the basis of line function departments and public institutions. The investment strategy was one of steadily and incremental growth in infrastructure on the basis of fairly modest investment in the extension of water services and of electricity to the unserved poor of the order of 0.33 and 0.36 per cent respectively of total state expenditure in 2003/4. The current targets of accelerated delivery in water and sanitation, which have been spelt out in detail by the Minister, are for the backlog in water delivery to be cleared by 2008 and that of sanitation by 2010. Although there is less emphasis on electrification there is also a general goal of the rural poor also enjoying electricity mainly through the extension of the grid or through alternative This paper contributes to this discussion by identifying the backlogs in these sectors, their location, and the additional investment needed to meet backlogs. The institutional context for sustainability is also developed. Investment in infrastructure at an annual level of R2.3 billion in electrification and R3.2 billion in water and sanitation is needed to clear these backlogs.-
Related Research Outputs:
- Empowerment through service delivery
- Facts, fiction and fabrication: service delivery in South Africa: 1994-1999
- Public appraisal of social and economic infrastructure delivery
- Facts, fiction or fabrication? Service delivery, 1994-1999
- Infrastructure mandates for change 1994-1999
- Rural development: the provision of basic infrastructure services
- Right on target?: delivery in electricity and water services
- Pipe dream for the province's poor?
- Cost recovery and the crisis of service delivery in South Africa
- The politics of water management: the case of the Orange River development project
- Infrastructure in educare centres in KwaZulu-Natal
- Preface
- The airport, the road and the school: infrastructure delivery in KwaZulu-Natal
- Empowerment through infrastructure and service delivery
- Service delivery perceptions during Mandela rule, 1994-1999
- Infrastructure mandates for reconstruction
- Land redistribution for agricultural development: case studies in three provinces: final report, October
- The sustainability of community water projects in KwaZulu-Natal
- Water services and public health: the 2000-01 cholera outbreak in KwaZulu-Natal, South Africa
- The sustainability of community water projects in KwaZulu-Natal